The Best Estimator
Home Samples Services Pricing Blog About
Theme Mode
3D model of a floor plate with supply ductwork, branch drops and an air handling unit

MEP & Building Systems

CSI Div. 21–28

Full mechanical, electrical, and plumbing takeoffs covering ductwork, piping, wiring, and fire/life-safety systems across a project.

What we measure

  • HVAC ductwork and equipment schedules
  • Plumbing pipe lengths, fittings, and fixtures
  • Fire suppression and sprinkler systems
  • Electrical conduit runs and panelboards
  • Lighting fixture counts and schedules
  • Low-voltage and communications rough-in

What you receive

Itemized quantity takeoff spreadsheet

Equipment and fixture schedules

Material and labor unit breakdowns

Where it's used

Commercial and institutional HVAC replacements, multi-family plumbing risers, ground-up MEP rough-in packages.

See a real MEP takeoff

Electrical Takeoff

Detailed estimate of electrical components and wiring.

Download sample

Send us your MEP drawings.

Tell us about your project and we'll reply with a quote.

  1. Send your drawings

    PDF, DWG, ZIP or XLSX. Any trade, any size.

  2. We measure every trade

    Each takeoff is checked by a second estimator.

  3. Get your takeoff

    Excel quantities and marked-up plans in 24–48 hours.